Dry Dock Junction
Located on Sidelaunch Way on Collingwood’s harbourfront, Dry Dock Junction occupies a site rooted in the town’s transportation and industrial history.
Location
Collingwood, ON
Client
Town of Collingwood
Status
Completed 2026
Dry Dock Junction is a public plaza connecting downtown Collingwood to the harbour. It opened in July 2026 as Phase 1 of the Town’s Shipyards Public Realm Plan, which grew out of the 2016 Waterfront Master Plan. Public engagement in 2023 and 2024 shaped a simple, flexible space for everyday use. People can stop for a coffee by the water, fill a water bottle mid ride, or gather for a pop-up event.
A rain garden runs through the heart of the plaza. Its native plantings capture and filter stormwater on site while adding seasonal colour and habitat to the waterfront. Raised planters and new trees provide shade and structure, and frame open sightlines from downtown through to the harbour and terminals.
Catenary lighting is strung overhead across the plaza, creating a warm canopy and a sense of enclosure for evening gatherings. Power pedestals support markets and events, while seating, bike racks and a water bottle filling station make the plaza comfortable for everyday use.
The design also draws on the site’s industrial past. The North Grey Railway crossed the corner of the property beginning in 1872. In 1883 the site became home to part of Dry Dock No. 1, which started 103 years of shipbuilding in Collingwood. The original dry dock footprint and former rail crossing are marked on site. A nautical alphabet set in interlocking pavers spells out the names of ships built and repaired in the harbour.
The plaza opened with a community ribbon cutting and a pop-up exhibition from the Collingwood Museum. Trish Clarke led the design while at Brook McIlroy, and Formis Landscape Architecture completed the project, with Trish serving as Project Manager and Contract Administrator.